LP Site Area (ha) 53
(to be tested through SRDF process)
[ Back to draft response. ]
LP Projected Jobs
11,400 (ditto)
LP Target Homes 1,250 (ditto)
Boroughs Camden/Islington
·
How to secure balance
between the employment, residential and leisure mix.
·
How to optimise high
quality and genuinely affordable housing at high densities.
·
Consider potential for
conference centre/facilities and hotel capacity.
·
How development in the
Opportunity Area and especially Kings Cross Railway Lands can contribute to the
wider regeneration of the area. Need to consider the relationship and
integration with surrounding communities and regeneration sites.
·
How to secure
improvement to the environment, heritage assets, and public realm including the
canal.
·
How proposals can
promote sustainable development, energy efficiency and potential to enhance the
ecology of the area.
·
Relationship between
development demand and public transport capacity.
·
Implementation of
Underground Northern Ticket Hall and Kingıs Cross station Western Concourse
(Network Rail) have now received backing from DfT. Scheme requires additional
£400m funding to complement existing refurbishments.
·
Need for transport
integration and consider the potential for enhanced bus and tram services to
the Opportunity Area.
·
Ensuring Cross River
Tram access to / terminus within the interchange hub.
·
Penetration of public
transport in and through the development site (bus/taxi routes and associated
bus stands need to be secured).
·
How to ensure site
permeability and pedestrian movement, blending high pedestrian flows and high
quality public realm in the interchange hub; provision of additional bike
parking.
·
How to provide good
quality open space linked to the wider network, whilst addressing any
deficiencies in public open space and improving access to nature.
·
Southside of Euston
Rd/Pentonville Rd will be a key setting for international terminal and has
scope for intensification. Explore scope for integrated environmental
enhancement/capacity uplift.
·
Electricity - Forecast
for Kingıs Cross up to 2016 10MW to 23MW of additional demand. Kingıs Cross area is fed from St
Pancras A & B substation. The
capacity at this substation will not be adequate to meet this load requirement
(this is especially so with the load requirement from Euston). One of the
options being explored is that of a new primary site at Kingıs Cross. This would depend on the rate of
development of the area and load increase. The proposal is to build a 132/11kV substation, equipped
with 2 X 60MVA transformers. The
132kV connections to the Kingıs Cross site could be made from either Back Hill
grid 132kV or City Road 132kV substation.
·
Gas – Capacity is
generally available but will need to be assessed in detail at the time of
definite development proposals.
·
Water – Local
supply infrastructure may need re-enforcement subject to nature of proposals.
·
Sewage – Study of
impact already completed for rail lands by Thames Water. Recommendation includes attenuation of
peak flow rates and some localised upsizing to avoid flooding.
·
Flood Plain/Drainage -
Area does not include identified floodplain. Following on site retention/Sustainable Urban Drainage
System including option of discharge to canal, remaining surface water can be
discharged to combined sewer.
·
Blue Ribbon Network -
Regents Canal flows through area. Development needs to relate well to canal and
maximise its use.
|
|
2002-2006 |
2007-2011 |
2012-2016 |
Post 2016 |
Total 2001-2016 |
|
Frameworks,
planning, development |
|
|
|
|
|
|
Projected New
Jobs |
|
|
|
|
11,400 |
|
New Homes |
|
|
|
|
1,250 |
|
Key transport
infrastructure |
|
|
|
|
|
|
National Rail Improvements |
|
|
|
|
|
|
Underground PPP |
|
|
|
|
|
|
Bus Capacity
increases |
|
|
|
|
|
|
CTRL - Phase 2 |
|
|
|
|
|
|
Thameslink 2000 |
|
|
|
|
|
|
Cross River
Tram |
|
|
|
|
|
|
Crossrail 2 |
|
|
|
|
|
|
|
Floorspace |
Jobs/Units |
|
Area |
|
|
|
Employment – Office |
|
|
|
Employment - Industrial |
|
|
|
Employment - Other |
|
|
|
Homes |
|
|
|
Homes - % affordable |
|
|